Implementing off-peak charging operations for electric vehicle chargers in the office park aims to optimize the grid load, reduce users' charging costs, and promote green travel. The following are some specific operation steps and precautions:
First of all, it is necessary to understand the peak and off-peak electricity price policies of the region where you are located. The division of peak and off-peak periods and the differences in electricity prices may vary in different regions. Take Fujian Province as an example. The peak period is usually from 8:00 to 22:00, and the electricity price increases by 0.03 yuan per kilowatt-hour on the basis of the combined meter price for residents. The off-peak period is during other periods, and the electricity price is reduced by 0.20 yuan per kilowatt-hour on the basis of the combined meter price for residents. By understanding the peak and off-peak electricity price policies, one can reasonably arrange the charging time and enjoy the electricity price discounts during the off-peak period.
In the office park, charging facilities that support time-of-use electricity pricing should be selected. These facilities are usually capable of automatically adjusting the charging power and charging time according to changes in grid load and electricity prices, achieving off-peak charging. If the charging facilities within the park do not support time-of-use electricity pricing, it is advisable to negotiate with the power supply department or the charging facility operator to upgrade or replace the equipment that supports time-of-use electricity pricing.
Many modern electric vehicles and charging piles are equipped with a scheduled charging function. Users can set the start and end times of charging in advance through the mobile phone APP or the operation interface of the charging pile. During off-peak hours, the charging piles will automatically start charging to ensure that users can complete the charging process at the lowest cost.
According to the electricity demand of the office park and the charging demand of electric vehicles, the charging plan should be reasonably arranged. For instance, the charging plan can be scheduled during off-peak hours such as at night or on weekends to reduce the impact on the grid load and lower the charging cost. At the same time, it is also possible to consider setting up multiple charging stations within the park to disperse the charging load and improve the charging efficiency.
During the charging process, the charging progress and status can be monitored in real time through the mobile phone APP or the display screen of the charging pile. If any abnormal charging or malfunction is detected, the charging facility operator or maintenance personnel should be contacted promptly for handling.
To encourage more users to participate in off-peak charging, promotional and publicity activities can be carried out within the office park. For instance, the benefits and operation methods of off-peak charging can be introduced to users through posters, brochures, electronic screens and other means. At the same time, we can also cooperate with enterprises within the park to jointly promote the concept of off-peak charging and create a favorable atmosphere for energy conservation and emission reduction.
Ensure the safety of charging facilities: Before charging, check whether the charging facilities are in good condition and whether the grounding is good, etc., to ensure the safety of the charging process.
Comply with charging regulations: When using charging facilities, one should abide by relevant charging regulations and operating procedures to avoid safety accidents caused by illegal operations.
Pay attention to battery health: Frequent low-power charging may cause damage to electric vehicle batteries. Therefore, where possible, the battery power should be kept within a reasonable range as much as possible to avoid over-discharging and frequent charging.
Through the above steps and precautions, off-peak charging operations of electric vehicle chargers can be achieved within the office park, optimizing the grid load, reducing users' charging costs, and promoting green travel.
Contact: Yolanda Wu
Phone: +86-13528760705
E-mail: sales@myriacle.com
Add: Building 3, Meicheng Industrial Zone, Bantian Street, Longgang District, Shenzhen City