Welcome: Hong Kong Myriacle Technology Co., Ltd

sales2@myriacle.com +86-181 6379 7827

News

Installation tutorial for Home slow-charging car chargers

Step-by-Step Guide to Installing a Home-Based Level 2 Electric Vehicle Charger
Installing a home charger for your electric vehicle (EV) ensures convenient and cost-effective charging overnight or during off-peak hours. Unlike portable chargers, a permanently installed Level 2 unit delivers faster charging speeds by utilizing a dedicated 240-volt circuit. Below is a detailed walkthrough for safely setting up a home EV charging station without requiring specialized tools or professional certification.

Preparing for Installation: Assessing Electrical Capacity and Location
Before purchasing or installing a charger, evaluate your home’s electrical system and select an optimal mounting spot to avoid compatibility issues or safety hazards.

  • Check Electrical Panel Capacity: Locate your home’s main electrical panel and verify the available amperage. Most Level 2 chargers require a 40-amp or 50-amp circuit, which may necessitate upgrading your panel if it’s already near capacity. Consult a licensed electrician to confirm your system can handle the additional load.

  • Choose a Weather-Resistant Installation Site: Select a location near your parking area, such as a garage wall or exterior siding, where the charger will be protected from direct sunlight, rain, or snow. Ensure the spot allows easy access to the charging cable and port without obstructing doors or walkways.

  • Measure Distance to Electrical Panel: Calculate the distance between the proposed charger location and the electrical panel. Longer runs may require thicker wiring (e.g., 6 AWG copper for 50-amp circuits) to minimize voltage drop and ensure efficient power delivery.

Mounting the Charger Unit: Secure Installation on Wall or Post
Proper mounting ensures stability and prevents accidental damage to the charger or vehicle. Follow these steps to affix the unit securely.

  • Use Manufacturer-Provided Templates: Many chargers include paper or digital templates to mark drill holes accurately. Align the template with the mounting surface, ensuring it’s level and centered in the desired location.

  • Drill Pilot Holes for Anchors: For concrete or brick surfaces, use a masonry bit to create holes for wall anchors. For drywall, locate studs using a stud finder and drill holes slightly smaller than the provided screws. Insert anchors if not mounting directly to studs.

  • Attach the Charger Backplate: Align the charger’s backplate with the pilot holes and secure it using screws or bolts. Avoid overtightening, which could strip threads or crack the mounting surface. Test the backplate’s stability by gently tugging before proceeding.

Wiring the Charger: Connecting to the Electrical Panel
This step involves running wiring from the electrical panel to the charger and making secure connections. If you’re uncomfortable working with live electricity, hire a professional electrician.

  • Turn Off Power at the Main Breaker: Locate the main circuit breaker in your electrical panel and switch it to the “off” position to cut power to the entire house. Use a voltage tester to confirm no current is flowing before touching any wires.

  • Run Wiring from Panel to Charger Location: Feed the appropriate gauge wire (e.g., 6 AWG for 50 amps) through conduit or cable clamps to protect it from damage. Leave enough slack at both ends to make connections without straining the wires.

  • Connect Wires to Charger Terminals: Open the charger’s wiring compartment and attach the hot wires (usually black and red) to the designated terminals, the neutral wire (white) to its terminal, and the ground wire (green or bare copper) to the grounding screw. Tighten connections firmly to prevent arcing or overheating.

  • Install a Dedicated Circuit Breaker: In the electrical panel, insert a new double-pole circuit breaker matching the charger’s amperage (e.g., 40A or 50A). Connect the hot wires to the breaker’s terminals and the neutral wire to the neutral bus bar. Attach the ground wire to the grounding bus bar.

Finalizing Setup: Testing and Safety Verification
After wiring, restore power and test the charger to ensure it operates correctly and safely.

  • Restore Power and Check for Errors: Switch the main breaker back to “on” and observe the charger’s display panel. It should indicate readiness without flashing error codes. If errors appear, double-check wiring connections or consult the manual.

  • Test Charging Functionality: Plug the charger into your EV’s inlet and initiate a charging session. Monitor the vehicle’s dashboard or charger app to confirm energy flow and check for unusual noises or overheating.

  • Inspect for Code Compliance: Ensure the installation adheres to local electrical codes, such as proper conduit usage, wire sizing, and grounding. Schedule an inspection with your local authority if required to validate the setup.

By following these steps, you can install a home EV charger safely and efficiently, enabling reliable charging for daily commutes or long trips. Always prioritize safety by wearing protective gear, using insulated tools, and consulting professionals when in doubt.


CATEGORIES

CONTACT US

Contact: Jim Wu

Phone: +86-181 6379 7827

E-mail: sales2@myriacle.com

Add: Building 3, Meicheng Industrial Zone, Bantian Street, Longgang District, Shenzhen City